Driveway Gravel ordered online by the ton. A dump truck delivers to your Newport address and unloads right where you point.






Newport gets about 72 inches of precipitation a year. That much rain makes drainage the first thing to plan for when you choose a driveway gravel size and base depth.
A good driveway gravel locks together and sheds water rather than turning into a muddy rut. The right choice depends on your surface, traffic and local ground conditions.
The most commonly ordered product for Newport driveways is standard Driveway Gravel, a blend that works for resurfacing and new construction alike. For specific jobs, one of the graded sizes may suit better.
| Product | Best For | Note |
|---|---|---|
| Driveway Gravel | General driveway top layer | All-purpose blend, good for resurfacing an existing drive. |
| 3/8" Driveway Gravel | Smooth top dressing, comfortable underfoot | Packs tight for walking surfaces and parking pads. |
| 3/4" Driveway Gravel | The standard driveway size, locks together well | Balances drainage and stability for most vehicles. |
| 1"-1 1/2" Driveway Gravel | Heavier traffic and soft ground | Holds up under dump trucks and on yielding soil. |
| 1 1/2" Driveway Gravel | Deep base layer under a finer top | Used as the first lift on new or rebuilt drives. |
| 2"-3" Driveway Gravel | Rural lanes, mud control, first lift | Coarse rock that bridges soft spots and sheds water. |
The chart below matches typical Newport jobs to the right product and depth. Use it as a starting point; your site conditions may shift the recommendation.
| Project | What to Order | Depth or Note |
|---|---|---|
| Resurfacing an existing driveway | 3/4" Driveway Gravel | 2 to 3 inches over compacted base |
| Culvert and shoulder repair | 1"-1 1/2" Driveway Gravel | 4 to 6 inches, tamped in lifts |
| New driveway base | 1 1/2" Driveway Gravel | 6 to 8 inches on prepared subgrade |
| Muddy rural lane | 2"-3" Driveway Gravel | 6 to 10 inches for first lift |
| Parking pad | 3/8" Driveway Gravel | 2 to 3 inches over compacted fill |
About 123 days a year bring at least a tenth of an inch of rain. That means scheduling delivery onto firm ground matters: a soggy base can rut before the gravel is spread. The county's roughly 147 single-family home permits in 2024 point to active construction, so many new driveways are going in alongside building sites.
Freezing temperatures hit about 13 days a year, and ground freezing here is real but moderate. That frost action pushes gravel sideways and upward, so a deeper first lift helps hold the surface flat through the wet season. Snowfall averages about 1 inch a year, but plowing even that amount can scrape loose gravel off the crown unless the top layer is well locked.
Freeze and thaw cycles work on loose material all winter, which is the argument for the deeper first lift. For an existing driveway that has held up for years, a thinner top dress may be enough.
Estimate the tonnage by measuring the length, width and planned depth in feet, then convert using a cubic yard factor. Our driveway gravel calculator does the math for any Newport delivery address. You see the tonnage before you add the product to your cart.
Order online by the ton, and the delivered price is calculated by ZIP code at checkout. A dump truck brings the load to your Newport property within a morning or afternoon window you choose. Most orders deliver in 3 business days minimum. Delivery information explains the windows, site access requirements and what to expect once the truck arrives.
First-time customers save $50 with code FIRSTTIMER50. You pick your delivery window at checkout: 7 am to 12 pm or 12 pm to 5 pm. After you place the order you get a confirmation email, and closer to the date a second email with the scheduled window and a photo of the material being loaded. Delivery only proceeds after you approve that second email. Learn more about Gravel Monkey and see customer reviews for insight into how the process works.
Many driveway projects include additional loads for the base layer, edges or landscaping. These materials are commonly ordered alongside driveway gravel in Newport.
Yes. With about 72 inches of precipitation a year, the ground rarely dries out completely. A coarser gravel like 1"-1 1/2" or 2"-3" lets water pass through the layer and reduces washout. A fine, tightly packed top like 3/8" may hold water on the surface if the base is not sloped.
Yes. About 13 days a year drop below freezing, and the ground freezes long enough to push gravel sideways. A deeper first lift of 1 1/2" or 2"-3" gravel resists frost heave better than a thin surface layer. The moderate freeze season means you do not need a full frost wall, but a 6-inch base is smart.
Smaller sizes like 3/8" and 3/4" lock into a smooth, walking-friendly surface. Larger sizes like 1"-1 1/2" and 2"-3" create a stable base that stays put on soft ground and handles heavy traffic. The coarser stone also drains faster, which reduces mud and puddles.
Edge restraints such as treated timber, steel edging or stacked stone keep the gravel contained. Without a border, truck tires and rain will push material into the lawn or road. A compacted shoulder of fill dirt or crushed concrete also helps hold the gravel line.
Your driveway gravel needs depend on the area you are covering and the depth you choose. Use our Newport page to explore sizes and start the order. The calculator will tell you the tonnage, and the checkout shows the delivered price before you commit.
Gravel Monkey also delivers driveway gravel to these towns and cities near Newport.
See the delivered price for your address and order driveway gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.