Skip to main content

Premium Driveway Gravel and More at Your Door | Gravel Monkey

USE COUPON “FIRSTTIMER50” FOR $50 OFF QUESTIONS? CALL OR TEXT (646) 809-3983

Gravel driveway calculator

New driveway or a top-up? Get tonnage per layer and in total, then order driveway gravel delivered.

Instant results, no form to fillBulk delivery to your door$50 off your first order with FIRSTTIMER50

Quantity calculator

Material: Driveway Gravel (1.36 tons per cubic yard) · calculating a different material?

You need about
0 tons
Cubic feet
Area
GM

Driveway Gravel

Bulk, sold by the ton, delivered to your driveway

Order – see price

Want a second pair of eyes on the math? Call or text (646) 809-3983. Takes five minutes and it’s free.

Email me this estimate










    Submit and receive an instant quote!





    Gravel Monkey recommends: orders of 4 tons or under, increase your estimate by 20%. Over 4 tons, 10%. The toggle above does it automatically.

    A single-car driveway, 12 by 50 feet, takes 5.2 tons of gravel for every 2 inches of depth. A quick top-up is one number. A new driveway from bare soil is a different number entirely. This calculator handles both.

    A gravel driveway built right is layers, not a pile: about 4 inches of compacted base stone, then a 2–3 inch top course that locks under traffic and sheds water. Resurfacing an existing drive only needs the top course. Pick the preset that matches your project and the depth is set for you.

    How to measure your driveway

    1. Measure length and width in feet. A curved drive is just a few straight rectangles added together, so use the add-area button.
    2. Pick the preset that matches the job: a 2-inch top-up, a 4-inch single course over a firm base, or a 6–8 inch new build.
    3. Calculate to see total tons.
    4. Order the top course in Driveway Gravel. For new builds, order the base course separately as road base or large crushed stone.

    The formula, with a worked example

    per layer: cubic yards = (L ft × W ft × layer depth in ÷ 12) ÷ 27
    tons = cubic yards × 1.36

    A new 12 × 50 ft driveway: 4″ of road base (11.1 tons) plus a 3″ top of 3/4″ driveway gravel (7.8 tons), so about 18.9 tons across two materials. A 2-inch top-up on the same driveway is 5.2 tons.

    How much does a ton of driveway gravel cover?

    Driveway gravel at 1.36 tons per cubic yard (about 2,720 lb):

    Depth1 cubic yard covers1 ton covers
    2 inches162 sq ft116 sq ft
    3 inches108 sq ft77 sq ft
    4 inches81 sq ft58 sq ft
    6 inches54 sq ft39 sq ft

    Recommended depth by project

    ProjectDepthNote
    Top-up or refresh2 inchesMost driveways want this every 2–4 years
    Single course over a firm base4 inchesCompact it in two lifts
    New driveway, total build6–8 inches4″ base (road base or 2–3″ stone) plus a 2–3″ top course
    Parking pads6–8 inchesSame build as a new driveway
    Soft or clay soil8–10 inches totalLay geotextile fabric under the base

    How much does driveway gravel weigh?

    About 2,720 pounds per cubic yard, or 1.36 tons. One ton covers roughly 119 square feet at 2 inches, 79 at 3. So each 2-inch layer on a 600 sq ft driveway is about 5 tons.

    Driveway tips from the yard

    • Crown the surface. Shape the middle 2–3 inches higher than the edges so water runs off instead of pooling into potholes.
    • Never lay gravel on grass or topsoil. Strip to firm subsoil, add fabric on soft ground, then build the base. Skip this and the driveway swallows the stone within a season. This is the most common mistake we get called about.
    • On any slope, use angular crushed gravel. Round stone migrates downhill and washboards.
    • Compact each layer before the next goes down. A rented plate compactor for a day is the difference between a driveway and a gravel pile.
    • Keep the top course at 3/8″–3/4″. Small enough to lock, big enough not to track into the house.

    Gravel driveway FAQs

    How many tons of gravel do I need for my driveway?

    A 12 × 50 ft single-car driveway needs about 5.2 tons per 2 inches of depth. A 2–3 inch top-up runs 6–9 tons. A full new build at 6–8 inches total runs 18–25 tons across base and top layers. Enter your dimensions above for the exact number.

    How deep should the gravel be on a driveway?

    A finished gravel driveway should total 6–8 inches: about 4 inches of compacted base stone plus a 2–3 inch top course. If a firm base is already down, keep the top course at 2–3 inches.

    What is the best gravel for a driveway?

    A 3/4-inch angular crushed gravel is the classic top layer. It locks under traffic and sheds water. Put it over a road-base or large-stone foundation, never straight on soil. Our driveway gravel range covers the size options.

    How often should I add gravel to a driveway?

    Plan on 1–2 inches every 2–4 years, sooner on slopes and busy drives. Raking regularly and filling low spots early stretches the interval.

    Can I put gravel over an existing dirt driveway?

    Over compacted roadbed, yes: add a 4-inch course and compact it. Over soft soil or grass, no. Strip it first and lay fabric plus base, or the new stone disappears into the mud the first wet month.

    Related calculators and guides

    Order driveway gravel by the ton

    For a top-up or a full build, delivered to your driveway. Code FIRSTTIMER50 takes $50 off a first order, or call/text (646) 809-3983.

    Order driveway gravel
    tonsrecommended order
    Order now
    0
      Your Cart
      Your cart is empty
      Gravel Monkey - Delivering Quality Aggregates to your Doorstep © 2026