Driveway Gravel ordered online by the ton. A dump truck delivers to your Clovis address and unloads right where you point.






A common mistake is ordering one size of driveway gravel for every part of the job. The base layer needs larger stone to spread loads, while the top layer needs smaller stone that locks together. Clovis gets about 18 inches of precipitation a year, so drainage matters for both layers.
Matching the size to the function gives a driveway that sheds water, bears traffic, and holds its shape. The right choice depends on whether you are building a base, finishing a surface, or fixing a soft spot.
The table below separates base stone from finish stone. Base sizes handle weight and drainage; finish sizes give a smooth, compact surface. Each size has a specific use.
| Product | Typical Use | Notes |
|---|---|---|
| Driveway Gravel | General driveway top layer | Good for most residential driveways. |
| 3/8" Driveway Gravel | Smooth top dressing, comfortable underfoot | Best for walking paths and thin surfaces. |
| 3/4" Driveway Gravel | The standard driveway size, locks together well | Most popular for finished driveways. |
| 1"-1 1/2" Driveway Gravel | Heavier traffic and soft ground | Use where cars or trucks need a stable surface. |
| 1 1/2" Driveway Gravel | Deep base layer under a finer top | Provides drainage and strength below. |
| 2"-3" Driveway Gravel | Rural lanes, mud control, first lift | Used where the ground is soft or rutted. |
The table below shows two approaches. A budget fix uses a single surface layer. A long-term build uses a base layer topped with finer stone. Both work in Clovis, but the freeze cycle favors the deeper build.
| Project | What to Order | Depth or Note |
|---|---|---|
| Parking pad | 3/4" Driveway Gravel | 4 to 6 inches, compacted |
| Resurfacing an existing driveway | 3/4" Driveway Gravel or 3/8" Driveway Gravel | 2 to 3 inches over existing base |
| Culvert and shoulder repair | 1"-1 1/2" Driveway Gravel | Fills voids, allows water flow |
| Muddy rural lane | 2"-3" Driveway Gravel | First lift, 6 to 8 inches |
| New driveway base | 1 1/2" Driveway Gravel then 3/4" Driveway Gravel | Base 4 inches, top 2 inches |
Clovis sees about 104 days a year with temperatures below 32F. That many freeze cycles can shift a poorly compacted base and cause the surface to rut or wash out. A stable base starts with the right stone size and thorough compaction.
Winters here are cold enough to move an unsettled base, so compaction is worth the extra pass. The soil in the area is commonly well drained, but drainage still matters. About 9 inches of snowfall a year means plowing can scrape a loose surface, so a locked top layer like 3/4-inch driveway gravel holds up better than a rounded stone.
Only about 32 days a year bring at least a tenth of an inch of rain, so scheduled deliveries on firm ground are usually easy to arrange. The ground around Clovis takes in water at a moderate rate, so standard base depths are usually enough to handle the rain that does fall.
Tonnage depends on the area you are covering and the depth you choose. A typical 10-foot by 50-foot driveway at 4 inches deep takes about 6 tons. Use our driveway gravel calculator to get a precise number for your project.
Gravel Monkey delivers driveway gravel by the ton straight to your address in Clovis. There is no yard to visit: you order online, choose a delivery window at checkout, and a dump truck brings the material. Lead time is at least 3 business days.
Delivery is priced by ZIP at checkout. Loads range from 1 ton to over 40 tons, and free delivery is available on qualifying orders. Use code FIRSTTIMER50 for $50 off your first order.
See how it works on the About Gravel Monkey page, read customer reviews, and review the full delivery information before ordering.
These materials work alongside driveway gravel for a complete job. Each has a specific role.
Yes. Clovis gets about 18 inches of precipitation a year, which means water does not drain away immediately. Choosing a base layer of 1 1/2-inch or larger stone helps route water away from the surface and prevents washout over time.
Yes. With about 104 days below freezing, the ground can heave and settle. A deeper base of 1 1/2-inch to 2-inch stone, well compacted, resists the movement caused by repeated freeze-thaw cycles.
Driveway gravel is not suitable for steep slopes, because it can slide under traffic. It also does not work well in areas that stay wet year-round, because the stone can sink into soft ground. For those conditions, consider crushed concrete or a geotextile fabric under the stone.
Landscape fabric is not required for most driveways, but it can help separate the gravel from the soil underneath. In Clovis, where the soil is well drained, fabric is optional. It is most useful on muddy sites or where weed growth is a problem.
Order the size that fits your job, choose your delivery day at checkout, and let the truck bring it to you. Browse the full list of driveway gravel products available for Clovis here.
Gravel Monkey also delivers to nearby communities. Check availability for:
See the delivered price for your address and order driveway gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.