Driveway Gravel ordered online by the ton. A dump truck delivers to your Lakeville address and unloads right where you point.






When you order driveway gravel in Lakeville, you choose from six sizes that range from a smooth 3/8 inch top dressing to a heavy 2 to 3 inch base layer. The size you pick controls how well the surface locks together, how it handles drainage, and how deep the lift needs to be. Lakeville gets about 51 inches of precipitation a year, so drainage and washout planning matter here.
For a typical driveway top, the standard 3/4 inch driveway gravel locks together well and sheds water. For soft ground or a deep first lift, the larger sizes give you a stable base that spreads the load.
The most-ordered driveway gravel in Lakeville is the 3/4 inch size, which works as a locked surface for most cars and light trucks. The table below lists every size we stock and what each is best for.
| Product | Best for | Note |
|---|---|---|
| Driveway Gravel | General driveway top layer | All-purpose blend for a durable driving surface. |
| 3/8" Driveway Gravel | Smooth top dressing, comfortable underfoot | Fine surface for walkways or areas where bare feet touch. |
| 3/4" Driveway Gravel | The standard driveway size, locks together well | Best balance of stability and comfort for most drives. |
| 1"-1 1/2" Driveway Gravel | Heavier traffic and soft ground | Larger stone for load-spreading on weaker subgrades. |
| 1 1/2" Driveway Gravel | Deep base layer under a finer top | Used as a first lift to build thickness on soft soil. |
| 2"-3" Driveway Gravel | Rural lanes, mud control, first lift | Coarsest size for mud-prone lanes or a thick base course. |
Match your project to the right product and depth. The table below shows typical jobs and what we recommend.
| Project | What to order | Depth or note |
|---|---|---|
| Culvert and shoulder repair | 2"-3" Driveway Gravel | 6 to 12 inches for drainage and stability |
| Parking pad | 3/4" Driveway Gravel | 4 to 6 inches, compacted |
| New driveway base | 1"-1 1/2" Driveway Gravel | 6 to 8 inches as a first lift |
| Muddy rural lane | 2"-3" Driveway Gravel | 8 to 12 inches to control mud |
| Resurfacing an existing driveway | 3/4" Driveway Gravel | 2 to 3 inches over existing surface |
Lakeville gets about 51 inches of precipitation a year, with about 85 days that bring measurable rain. That means runoff and drainage matter, and the hydrologic group C/D soils in the area are a key factor. Where the ground is drained it takes water in slowly and sheds a fair amount across the surface; where it is not drained, most rain runs across the surface. Drainage and a deeper base matter more here than elsewhere.
About 133 days a year drop below freezing, and the county sees roughly 34 inches of snowfall annually. Freeze and thaw cycles work on loose material all winter, which is the argument for the deeper first lift. The moderate frost depth means a properly built base with adequate thickness will resist heaving.
Soils mapped in the Lakeville area are commonly moderately well drained. That area guidance suggests that many driveways will benefit from a base layer of larger stone to improve drainage under the surface. The overall soil water behavior depends on site-specific drainage, so inspecting your own ground is the best step.
To estimate how many tons of driveway gravel you need, measure the length and width of the area in feet and decide on the depth in inches. Use our driveway gravel calculator to get a quick tonnage figure that you can use at checkout.
You order driveway gravel online by the ton, and the price for delivery to your Lakeville address is shown at checkout based on your ZIP code. Loads range from 1 to 40 plus tons, and free delivery is available on qualifying orders. Use the code FIRSTTIMER50 to get $50 off your first order.
The delivery date is chosen at checkout and must be at least 3 business days after the order date. You pick a morning window (7 am to 12 pm) or afternoon (12 pm to 5 pm). You will receive an email confirmation, then a second email closer to the date with the scheduled window and a photo of the material being loaded. Delivery only goes ahead once you approve that second email.
You need to be available during the delivery window, or have someone you nominate at the site. Access requires a road width of at least 12 feet. For more details, see our delivery information page. Read customer reviews and learn more about Gravel Monkey on the about page.
These materials pair well with driveway gravel for a complete job.
Yes, Lakeville gets about 51 inches of precipitation a year. That fact means drainage planning is important. Using a base layer of larger stone and a proper crown will reduce washout risk.
Yes, about 133 days a year drop below freezing, and the ground freezes moderately. The delivery crew works with you to schedule on firm ground. You choose a window at checkout, and the truck comes as long as access is clear.
The depth depends on your soil and traffic. For a passenger car driveway on moderately well drained soil, a 4 to 6 inch base of larger stone topped with 2 to 3 inches of 3/4 inch gravel is typical. For soft ground or a rural lane, go deeper with a 6 to 8 inch base of 1 1/2 inch or 2 to 3 inch stone.
The truck needs a road width of at least 12 feet. The site must be accessible and free of overhead hazards. If access is restricted, the crew unloads as close to the requested spot as they safely can.
Visit the Lakeville page to order driveway gravel and see the delivered price for your address. Choose your size, pick a delivery window, and get bulk gravel brought to your site.
We also deliver driveway gravel to nearby towns.
See the delivered price for your address and order driveway gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.