Driveway Gravel ordered online by the ton. A dump truck delivers to your New Roads address and unloads right where you point.






Getting driveway gravel delivered to your property means paying for the material, the distance, and the truck time. The final price depends on which product you choose and how many tons you need.
New Roads gets about 64 inches of precipitation a year, so drainage and washout should be part of your plan from the start.
Each size of driveway gravel suits a different job. Choosing the wrong one can leave you with a surface that shifts, ruts, or drains poorly. The table below matches each product to its best use and its limits.
| Product | Best for | Note |
|---|---|---|
| Driveway Gravel | General driveway top layer | Not ideal for steep slopes; may shift without a base. |
| 3/8" Driveway Gravel | Smooth top dressing, comfortable underfoot | Not for heavy traffic; can get pushed aside by tires. |
| 3/4" Driveway Gravel | The standard driveway size, locks together well | Not for very soft ground; needs a deeper base layer. |
| 1"-1 1/2" Driveway Gravel | Heavier traffic and soft ground | Not for finished surfaces; better as a base or sub-base. |
| 1 1/2" Driveway Gravel | Deep base layer under a finer top | Not suitable alone for driving; requires a cap of smaller stone. |
| 2"-3" Driveway Gravel | Rural lanes, mud control, first lift | Not a finished surface; best for building up deep, stable fill. |
Your project type determines the right stone size and depth. Use this quick reference to match the job to the product.
| Project | What to order | Depth or note |
|---|---|---|
| New driveway base | 1 1/2" Driveway Gravel | 4 to 6 inches after compaction |
| Parking pad | 3/4" Driveway Gravel | 3 to 4 inches, well compacted |
| Resurfacing an existing driveway | Driveway Gravel or 3/4" Driveway Gravel | 2 to 3 inches, depends on current base |
| Culvert and shoulder repair | 1"-1 1/2" Driveway Gravel | Fill to grade, then cover with finer stone |
| Muddy rural lane | 2"-3" Driveway Gravel | First lift of 6 to 8 inches, then cap |
New Roads sits in Pointe Coupee Parish, where about 74 days a year bring at least a tenth of an inch of rain. Scheduling your delivery onto firm ground matters because wet soil can rut under the truck and under the stone.
About 20 days a year drop below 32F. That short freeze season means the ground does not heave much here, so the base layer can be shallower than in colder areas. Frost is not the constraint here, so the calendar is driven by rain and by how wet the ground is.
Soils mapped in the New Roads area are commonly somewhat poorly drained. That suggests you may need more base stone under the surface layer to keep water from softening the support. Ground around New Roads is in hydrologic group C, which means it takes water in slowly and sheds a fair amount across the surface. A deeper drainage layer earns its place under your driveway gravel.
Estimating tonnage starts with the area you want to cover and the depth you plan to use. Measure the length and width of the driveway in feet, multiply for square footage, and decide on a depth in inches. Use our driveway gravel calculator to convert those numbers into tons for any of the products listed above.
Buying driveway gravel from Gravel Monkey is straightforward. You order online by the ton, and the delivered price is calculated at checkout based on your ZIP code. A dump truck brings the load to your address, typically 1 to 40-plus tons per trip. Free delivery applies on qualifying orders, and first-time customers can use code FIRSTTIMER50 for $50 off their first order.
You choose your delivery date at checkout, which must be at least 3 business days after the order date. Pick a morning window (7 am to 12 pm) or an afternoon window (12 pm to 5 pm). A valid phone number is required, and someone 18 or older must be present during the window. Learn more on our delivery information page. Read what others have said on customer reviews. For background on how we work, see About Gravel Monkey.
No. New Roads sees about 20 freezing days a year, a short season that does not push the ground enough to require deeper base layers. The standard depth recommendations on this page work for the local freeze pattern.
Yes. With roughly 64 inches of annual precipitation and soil that drains slowly, water management matters. Choosing a larger base stone, like 1"-1 1/2" Driveway Gravel, and including a deeper drainage layer helps keep the driveway stable.
Driveway gravel is not suitable for high-speed roads, commercial truck terminals, or surfaces that need a smooth, hard finish. For walking paths or patios, consider a finer crushed stone or sand.
3/4" Driveway Gravel is the most common choice. It locks together well, handles regular car and light truck traffic, and provides a stable surface without being too rough.
Every driveway and every address is different. The fastest way to know what your project will cost is to check the delivered price for your specific location. Visit the New Roads city page to start an order or use the calculator to estimate tons.
Gravel Monkey also delivers driveway gravel to nearby communities:
See the delivered price for your address and order driveway gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.