Driveway Gravel ordered online by the ton. A dump truck delivers to your Andalusia address and unloads right where you point.






Andalusia gets about 60 inches of precipitation a year. That kind of rainfall means drainage and washout have to be part of your driveway plan from the start. The driveway gravel you choose needs to handle that water without turning into a muddy mess.
Good driveway gravel locks together and lets water run through instead of pooling on top. Getting the right size and depth for your site keeps the surface stable even after a heavy storm.
The most common driveway gravel in Andalusia is 3/4" Driveway Gravel. It locks together well and handles the local rainfall. Other sizes work better for different jobs.
| Product | What it is for | Note |
|---|---|---|
| Driveway Gravel | General driveway top layer | Versatile blend for most driveways |
| 3/8" Driveway Gravel | Smooth top dressing, comfortable underfoot | Good for paths and top layer on existing gravel |
| 3/4" Driveway Gravel | The standard driveway size, locks together well | Best balance of drainage and stability |
| 1"-1 1/2" Driveway Gravel | Heavier traffic and soft ground | Handles trucks and equipment without sinking |
| 1 1/2" Driveway Gravel | Deep base layer under a finer top | Provides structural support in wet soil |
| 2"-3" Driveway Gravel | Rural lanes, mud control, first lift | Coarse stone for heavy-duty base work |
Match the project to the right product and depth for a driveway that lasts. Here are five common jobs and the gravel that works best.
| Project | What to order | Depth or note |
|---|---|---|
| Culvert and shoulder repair | 2"-3" Driveway Gravel | 4 to 6 inches as base, then top with 3/4" |
| New driveway base | 1 1/2" Driveway Gravel | 4 to 6 inches compacted |
| Resurfacing an existing driveway | 3/4" Driveway Gravel | 2 to 3 inches over firm base |
| Muddy rural lane | 2"-3" Driveway Gravel | 6 inches or more for mud control |
| Parking pad | 3/4" Driveway Gravel | 3 to 4 inches on compacted subgrade |
Andalusia has about 75 wet days a year, which means the ground stays soft for long periods. Scheduling your delivery onto firm ground helps avoid ruts from the dump truck. About 40 days a year drop below 32F, but ground freezing here is not a significant factor, so you do not need an extra-deep base to handle frost heave. Snowfall is about 0 inches a year, so plowing damage to a loose surface is not a concern.
The ground around Andalusia is in hydrologic group C, which means it takes water in slowly and sheds a fair amount across the surface. A deeper drainage layer earns its place against runoff. Without a hard freeze to lift the surface, drainage and washout are what decide how long the material lasts. Choosing a gravel size that locks together well helps keep your driveway stable through the wet season.
The amount of driveway gravel you need depends on the area and the depth you plan to lay. Use our driveway gravel calculator to get a quick estimate for your project. Enter your dimensions and it gives you the tons required.
You order online by the ton. Your delivery price is calculated by ZIP code at checkout. A dump truck delivers the gravel to your address, and loads range from 1 to 40 plus tons. Free delivery applies on qualifying orders. Use code FIRSTTIMER50 for $50 off your first order.
The delivery date must be at least 3 business days after the order date. You choose a morning window (7 am to 12 pm) or afternoon window (12 pm to 5 pm). You must be present or have someone you nominate at the site during that window. A valid phone number is required to confirm delivery.
You get an email confirmation when the order is placed and a second email closer to the date with the scheduled window and a photo of the material being loaded. Delivery goes ahead only after you approve that second email. About Gravel Monkey explains how we source and deliver. See customer reviews for feedback from other buyers. Full details are on the delivery information page.
Many customers order these materials in the same trip for related jobs around the property.
Yes. Andalusia gets about 60 inches of precipitation a year. That much rain can wash out a driveway that is not built with a proper gravel base and drainage layer.
It is. With about 75 wet days a year, the soil stays moist for long stretches. The local soil takes water in slowly, so a deeper drainage layer under the gravel helps keep the surface solid.
Driveway gravel is not meant for walkways or patios where you want a smooth, even surface. Smaller gravel or crushed stone works better for those areas.
No. You or someone you nominate must be at the site during the delivery window. If nobody is there, a missed delivery fee can apply and the order is not refunded.
Order online and choose your delivery window at checkout. Gravel Monkey delivers driveway gravel to homes and job sites across Andalusia. Get your delivered price and schedule your delivery today. Visit the Andalusia hub page for more local information.
We also deliver to nearby areas.
See the delivered price for your address and order driveway gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.