Fill Dirt ordered online by the ton. A dump truck delivers to your Chadron address and unloads right where you point.
Contractors working on a foundation backfill or a commercial pad usually need fill dirt in truckload quantities. Homeowners tackling a low yard or a stump hole might want a smaller load. Both groups buy the same material, but the way they order and plan can differ.
Chadron gets about 18 inches of precipitation a year, so drainage and washout planning matter even with a structural fill. A proper slope and compaction keep the grade stable through wet spells.
Fill dirt is a basic, screened soil with no organic matter. It is used to raise grade, fill holes, and backfill around structures. You order it by the ton, and the truck delivers it to your address.
| Product | Use | Note |
|---|---|---|
| Fill Dirt | Raising grade, filling holes, backfill | No organic content, compacts well for structural fill. |
Fill dirt solves a few specific problems around the home or job site. The table below matches the project to what you order.
| Project | What to Order | Depth or Note |
|---|---|---|
| Backfill around a foundation | Fill Dirt | Compact in 8-inch lifts |
| Filling a pool or pond | Fill Dirt | Fill in layers, allow settling |
| Building up a pad | Fill Dirt | 6 to 12 inches, then compact |
| Burying a stump hole | Fill Dirt | Overfill slightly, tamp down |
| Raising a low yard | Fill Dirt | Add 4 to 8 inches, grade away |
Chadron sees about 44 days a year with at least a tenth of an inch of rain. Scheduling the delivery onto firm ground is easier if you pick a dry window. The 180 freezing days each year drop below 32F, which narrows the work season and means the ground moves more as it freezes and thaws.
Deep frost keeps the ground closed for months, so this work waits for the thaw rather than the calendar. The 45 inches of snowfall each year can cause plowing damage to a loose fill surface, so you might want to protect a graded area until it settles.
Soils mapped in the Chadron area are commonly well drained, which means you may need less base stone under the surface layer. The ground around Chadron is in hydrologic group B and takes water in at a moderate rate, so standard base depth is usually enough.
The amount of fill dirt you need depends on the area and the depth you want to raise it. A cubic yard of fill dirt weighs about 1.3 to 1.5 tons. Use the fill dirt calculator to estimate your project tonnage based on length, width, and depth.
You order online by the ton. At checkout, the delivered price is calculated for your ZIP code. A dump truck brings the load to your address, from a single ton up to 40 or more tons. Free delivery applies on qualifying orders. Use code FIRSTTIMER50 at checkout to get $50 off your first order.
Choose your delivery date (at least 3 business days out) and a window: morning 7 am to 12 pm or afternoon 12 pm to 5 pm. You receive an email confirmation, then a second email with the scheduled window and a photo of the load. Delivery goes ahead only after you approve that email. Provide a valid phone number or the order may be delayed.
Learn more about how we work on the About Gravel Monkey page. Read customer reviews and see full delivery information.
Fill dirt is structural, but for the surface layer you need a growing medium. Pair it with topsoil or another material to finish the job.
The tonnage depends on the volume of the space you are filling. Chadron gets about 18 inches of precipitation a year, so you need enough fill to keep water from pooling. A cubic yard of fill dirt weighs 1.3 to 1.5 tons. Use the fill dirt calculator to get a rough number for your dimensions.
Yes, Gravel Monkey delivers fill dirt to Chadron and nearby communities. Delivery is by dump truck to your address. The county permitted about 12 single-family homes in 2024, so some areas may be new construction sites with easy truck access. You choose the delivery date and window at checkout.
Fill dirt is not for planting. It has no organic matter and compacts tightly. For a planting bed, put topsoil on top of the fill dirt. A common depth for topsoil over fill is 4 to 6 inches.
Fill dirt needs time to settle after placement. Wait at least a few weeks of good weather before adding topsoil or seeding. Tamping or rolling the fill helps reduce later settling.
You order online, we calculate the delivered price for your address, and a dump truck brings the fill dirt to your site. The delivery window is chosen at checkout, and you approve the load before it arrives. Visit the Chadron hub page to start your order or check coverage for your street.
We also deliver to nearby locations:
See the delivered price for your address and order fill dirt by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.