Crushed Stone ordered online by the ton. A dump truck delivers to your West Burlington address and unloads right where you point.








The final cost of a crushed stone delivery depends on the quantity you order and how far the truck travels to reach you. West Burlington gets about 39 inches of precipitation a year, so drainage planning matters for any stone installation.
Choosing the right size and type of crushed stone means the job lasts longer and needs less upkeep. This page covers the crushed stone products available through Gravel Monkey for projects in West Burlington.
Each product has a specific use. Pay attention to what each is not meant for before you decide.
| Product | Best For | Note |
|---|---|---|
| 3/8" Crushed Stone | Paver setting bed and tight fill | Not suitable for base layers under heavy traffic. |
| 3/4" Crushed Stone | The all-purpose size for base and drainage | Avoid for decorative surfaces where uniform color matters. |
| 1"-1 1/2" Crushed Stone | Heavy base and erosion control | Too large for pipe backfill in narrow trenches. |
| 2"-3" Crushed Stone | Rip rap style edging and deep fill | Not for areas where people walk or children play. |
| #57 Crushed Stone | Concrete aggregate, French drains, driveway base | Avoid for drainage backfill where smaller stone would clog less. |
| #67 Stone | Concrete mix and drainage backfill | Not ideal for surface parking lots because of sharp edges. |
| #8 Stone | Paver joints and pipe bedding | Too small to serve as a base layer on its own. |
| #10 Rock Screenings | Leveling course under pavers | Not for drainage applications because fines retain water. |
The table below matches five common projects to the right crushed stone product.
| Project | What to order | Depth or note |
|---|---|---|
| Concrete slab base | #57 Crushed Stone or 3/4" Crushed Stone | 4 to 6 inches after compaction |
| Driveway base layer | 3/4" Crushed Stone | 6 to 8 inches |
| Pipe backfill | #8 Stone or 3/8" Crushed Stone | Cover pipe per specification |
| French drain | #57 Crushed Stone or 3/4" Crushed Stone | 12 inches around pipe |
| Paver bedding | #10 Rock Screenings | 1 inch |
West Burlington experiences about 122 days per year with temperatures below 32 degrees Fahrenheit. This freeze-thaw cycle can shift the ground, which means a crushed stone base must be deep enough to resist movement. Hard freezes shape the calendar here, so base work is easier to get right from late spring through fall.
Annual snowfall averages about 20 inches. Plowing a driveway too soon after install can displace loose stone, so wait for compaction or use a larger product. Soils mapped in the West Burlington area are commonly somewhat poorly drained, which suggests more base stone may be needed under the surface layer to direct water away.
The ground around West Burlington is in dual hydrologic group C/D. Where the site is drained, rain soaks in slowly and some runs off; where it is not, most water runs across the surface. This makes drainage planning and a thicker base more important than in areas with well-drained soil.
The tonnage you need depends on the area to cover and the depth of the stone layer. Use the crushed stone calculator to get a rough estimate for your West Burlington project. The calculator asks for length, width and depth and returns a tonnage range.
Ordering is done online through the Gravel Monkey website. You choose the product and quantity in tons, then select a delivery date and window at checkout. Delivery is priced by ZIP code and offered for loads from 1 to 40-plus tons. Free delivery may apply on qualifying orders. Use code FIRSTTIMER50 at checkout to save $50 on a first order.
Read more about the Gravel Monkey process and check customer reviews for feedback from other buyers. Full terms are on the delivery information page.
The best time is from late spring through fall. West Burlington has about 122 days a year with freezing temperatures, which makes base work difficult during winter. Ordering during the warm months gives you a longer window to spread and compact the stone.
It can. Soils mapped in the West Burlington area are commonly somewhat poorly drained. If your site has slow drainage, a thicker base layer of crushed stone may be needed to keep the surface stable and prevent water from pooling.
Yes. First-time customers can use the discount code FIRSTTIMER50 at checkout to get $50 off their order. The code applies to the first order only and cannot be combined with other offers.
Yes, you or a nominated person must be at the site during the chosen delivery window. The driver needs someone to confirm the drop location and sign for the load. If no one is available, a redelivery fee may apply.
Whether you are starting a driveway, building a patio base or installing a French drain, Gravel Monkey delivers crushed stone to addresses in West Burlington. Visit the West Burlington materials page to start your order.
For delivery to nearby areas, see these pages:
See the delivered price for your address and order crushed stone by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.