Fill Dirt ordered online by the ton. A dump truck delivers to your Venice address and unloads right where you point.
Fill dirt is the structural base for raising grade, backfill and filling holes. You buy it by the ton online, and Gravel Monkey delivers it in a dump truck to your Venice address. No need to visit a yard or load anything yourself.
Venice gets about 54 inches of precipitation a year, so drainage and washout planning are part of any fill project. That is why choosing the right material and ordering the right amount matter from the start.
Fill dirt from Gravel Monkey is clean, mineral soil with no organic matter. It compacts well and does not settle like topsoil. It is not meant for planting, but it is exactly what you need to change the shape of the ground.
| Product | Best for | Note |
|---|---|---|
| Fill Dirt | Raising grade, filling holes, backfill | Structural fill that compacts firmly and does not shift. |
The table below matches typical projects to the right product and a typical depth.
| Project | What to order | Depth or note |
|---|---|---|
| Building up a pad for a shed or addition | Fill Dirt | 6 to 12 inches compacted in lifts |
| Filling a pool or pond | Fill Dirt | Fill in stages, compact each 6 to 8 inches |
| Raising a low yard | Fill Dirt | 4 to 6 inches after compaction |
| Backfill around a foundation | Fill Dirt | Place and compact in 6-inch lifts |
| Burying a stump hole | Fill Dirt | Fill to grade, allow for settling |
Soils mapped in the Venice area are commonly poorly drained. That means you may need a thicker base layer of stone underneath the fill dirt to keep water from pooling. Around Venice the ground is in dual hydrologic group C/D: where it is drained it takes water in slowly and sheds a fair amount across the surface; where it is not, water runs across the surface almost entirely. Drainage planning matters more here than in many places.
Venice has about 70 days a year with at least a tenth of an inch of rain, so scheduling your delivery onto firm ground is important. Only about 1 day a year drops below freezing, which means you can work nearly year round without worrying about frost heave. The ground moves very little from freeze-thaw cycles.
Order once the site is ready, because material sitting in the wrong spot gets moved twice.
Calculate the volume of the area you are filling: length times width times depth in feet, then convert to cubic yards. A cubic yard of fill dirt weighs about 1.3 tons. Use our fill dirt calculator to get a tonnage estimate fast.
Order online by the ton. Delivery is priced by your ZIP code at checkout. A dump truck brings 1 to 40 plus tons straight to your address. Free delivery applies on qualifying orders. Use code FIRSTTIMER50 at checkout for $50 off your first order.
Choose your delivery window: morning (7 am to 12 pm) or afternoon (12 pm to 5 pm). The delivery date must be at least 3 business days after the order date. You will receive an email confirmation, then a second email closer to the date with the scheduled window and a photo of the material being loaded. Delivery goes ahead only after you approve that second email. Someone over 18 must be present during the window. The truck needs a road width of at least 12 feet. Read more on our delivery information page. See what customers say on our customer reviews page. Learn about our approach on the About Gravel Monkey page.
For a complete job, consider these materials that go under or over fill dirt.
Delivery cost depends on your ZIP code and the tonnage you order. Venice gets about 54 inches of rain a year, so scheduling can be affected by wet conditions, but the final price is displayed at checkout.
Yes, we deliver fill dirt to Venice and all nearby communities. Venice has about 70 wet days a year, so we recommend scheduling delivery when the ground is firm and accessible.
The truck needs a road width of at least 12 feet and firm ground. If access is tight, the crew will unload as close as they safely can. You are responsible for making sure the property can handle a heavy truck.
The depth depends on the project. For raising a yard, 4 to 6 inches after compaction is typical. For backfill around a foundation, place in 6-inch lifts. Use the fill dirt calculator to match depth to tonnage.
Check your delivered price by entering your address on our Venice hub page. No yard visits, no haggling. We handle the truck, the drop and the pricing.
We also deliver fill dirt to these nearby locations:
See the delivered price for your address and order fill dirt by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.