Crushed Gravel ordered online by the ton. A dump truck delivers to your Boulder Creek address and unloads right where you point.
Boulder Creek gets about 42 inches of precipitation a year, so drainage and washout planning matter when you choose a crushed gravel size. The right particle size and compaction determine how well a surface sheds water and supports weight. The available sizes range from fine 3/8-inch material for compacting layers up to 2- to 3-inch stone for mud control and deep fills.
Each size changes the job it can handle. Pick a larger stone for structural base under heavy loads and a smaller one for a smooth, compacted finish.
The 3/4-inch crushed gravel is the most ordered size for base layers and driveways in Boulder Creek. It compacts firmly and handles moderate traffic. Other sizes fill specific roles.
| Product | Best for | Note |
|---|---|---|
| 3/8" Crushed Gravel | Fine compacting layer | Packs to a smooth surface for paths or under pavers. |
| 3/4" Crushed Gravel | The workhorse size for base and drives | Handles most residential and light commercial loads. |
| 1" - 1 1/2" Crushed Gravel | Structural base under heavy loads | Provides stability for equipment access or parking. |
| 1 1/2" Crushed Gravel | First lift over soft subgrade | Bridges weak soil before a finer topping. |
| 2"-3" Crushed Gravel | Mud control and deep fill | Drains through quickly and resists rutting. |
Match the product to the job and decide the depth. The table below shows common projects and the recommended crushed gravel size.
| Project | What to order | Depth or note |
|---|---|---|
| Farm and site access road | 3/4" Crushed Gravel | Compacted in 4- to 6-inch lifts |
| Soft or muddy subgrade | 1 1/2" Crushed Gravel | First lift, then cap with 3/4" |
| Shed or slab pad | 3/8" Crushed Gravel | Compacted to 2 to 3 inches |
| Compacted base | 3/4" Crushed Gravel | Typically 4 inches after compaction |
| Trench backfill | 1" - 1 1/2" Crushed Gravel | Drains around pipes or utilities |
Boulder Creek has about 42 inches of precipitation a year, which means drainage and washout planning are essential. The approximately 45 days a year that bring at least a tenth of an inch of rain require scheduling the delivery onto firm ground. With about 13 freezing days a year, the work window narrows and the ground moves during freeze-thaw cycles, so plan the base depth accordingly.
Soils mapped in the Boulder Creek area are commonly well drained, which influences how much base stone you need under the surface layer. The ground around Boulder Creek is in hydrologic group A, which means it soaks water up quickly and produces little runoff. This behavior reduces the amount of drainage stone needed underneath the surface. Order once the site is ready, because material sitting in the wrong spot gets moved twice.
Estimating tonnage starts with the project's length, width, and desired depth. Convert the cubic feet to tons using the material calculators to get an accurate figure before you order.
Order online by the ton. At checkout, you choose a delivery window and see the total price based on your ZIP code. A dump truck brings 1 to 40+ tons to your address. Use code FIRSTTIMER50 for $50 off your first order. The delivery date must be at least 3 business days after ordering. You select morning (7 am to 12 pm) or afternoon (12 pm to 5 pm). A valid phone number is required at checkout. After placing the order, you receive an email confirmation. Near the delivery date, you get a second email with the scheduled window and a photo of the material being loaded. You must approve that email to proceed. Someone you nominate must be present during the delivery window. The site needs a road width of at least 12 feet for the truck. If access is restricted, the crew unloads as close as safely possible. Read more about delivery information, About Gravel Monkey, and customer reviews.
Since Boulder Creek receives about 42 inches of precipitation a year, a smaller load may be easier to schedule between wet days. The smallest load we deliver is 1 ton.
With about 13 freezing days a year, the best time is during dry, non-freezing months like late spring through early fall. This avoids mud and frost heave issues.
Yes, a contractor can place an order on behalf of a customer. The customer's valid phone number and delivery address are required at checkout.
Crushed gravel is not suitable for projects that need a polished or decorative appearance, such as a walkway intended for barefoot use. It is also not ideal for applications where a uniform color or shape is critical, because natural variation occurs.
Knowing how many tons of crushed gravel you need saves time and avoids overordering. Use the material calculators to estimate your quantity. For more options, see the Boulder Creek hub page.
Gravel Monkey also delivers to nearby areas:
See the delivered price for your address and order crushed gravel by the ton online. Loads run from 1 to over 40 tons, with free delivery on qualifying orders.
Fill out the form and our sales team will get back to you within the hour.